Last reviewed: November 2026
Requirements vary by parcel, township, municipality, and zoning district. This article summarizes publicly available sources. It is not a zoning determination, survey, permit approval, or legal advice. Confirm current requirements with the responsible jurisdiction before buying land, finalizing a design, or beginning work.
The choice between septic vs sewer systems is usually made by the parcel, not the homeowner. If an accessible public sewer serves the property, the responsible authority may require a connection. Otherwise, the land must support an approved onsite sewage system. It must also provide enough suitable ground for the initial system and its future replacement.
Do not accept “sewer nearby” or “septic should be fine” as an answer. Before buying, ask the utility to confirm service for the parcel. Also ask the responsible health department what soil and site review it will require.
Where public sewer is confirmed locally
Public utilities do not follow township lines neatly. For example, a rural road may pass through a county utility district. Another parcel in the same township may need septic and a private well. Fairfield County Utilities serves specific subdivisions and corridors rather than every parcel in the surrounding township.
| Area | Confirmed public service | Where onsite systems are common |
|---|---|---|
| Fairfield County | Lancaster, Canal Winchester, Bremen, and Carroll have public water and sewer. Fairfield County Utilities also serves named subdivisions and corridors. Part of Greenfield Township is served by the Greenfield Township Water & Sewer District, but service is not township-wide. | Unserved portions of Fairfield County townships and rural land outside municipal or county utility areas require Fairfield County Health Department review for septic. If public water is also unavailable, a private water-system permit is required. |
| Hocking County | Logan has municipal water and sewer. The Hocking County Sewer Department provides wastewater service in Rockbridge, Haydenville, Carbon Hill, Murray City, and Lake-moor. However, public water was not confirmed for every one of those areas. | Rural township land outside Logan and the named county sewer systems commonly relies on onsite sewage and private water, subject to Hocking County Health Department approval. Confirm the individual parcel. |
| Perry County | Thornville, New Lexington, and Somerset have public water and sewer. Junction City has a public wastewater system, but public-water coverage must be confirmed. Crooksville has public water and a special sanitary configuration described below. | Perry County Health Department regulates individual systems where public or central sewer is unavailable, particularly in rural areas. Some rural parcels may have county water but still require septic. Therefore, septic does not automatically mean a private well. |
Ask the utility for a parcel-specific answer rather than relying on this table alone. Ohio EPA does not maintain the local sewer maps used to determine service; those maps and connection decisions come from the responsible utility.
Crooksville is a special case
Crooksville does not use a conventional system that sends raw household wastewater directly through a gravity lateral. Instead, each house or business has a septic tank. The collected effluent moves through a variable-grade system to pumping stations and the joint Crooksville–Roseville treatment facility.
A buyer there should ask who owns and maintains the tank, service line, pumps, and other components serving the property. Do not assume the responsibilities are identical to either a conventional private septic system or a standard municipal sewer connection.
First determine whether connection is required
Ohio does not allow a household sewage treatment system to be installed or operated where an accessible sanitary sewer is available. Depending on the system, a local board of health, municipality, county, sewer district, or utility may direct the property to connect.
Ohio Revised Code 6117.51 took effect on May 6, 2005. Under this law, county commissioners may order a connection to an available and accessible county sewer. However, they must first obtain the required health-board resolution and engineering determination. One statutory exception applies when the building foundation is more than 200 feet from the nearest boundary of the sewer right-of-way. Requirements vary by parcel and jurisdiction, so confirm current applicability with the responsible sewer authority.
Give the utility the parcel number and proposed house location. Then request answers to these questions:
- Is sewer service available to this parcel now?
- Is connection required for new construction?
- Where are the main and approved connection point?
- Can the house drain by gravity, or would it require pumping?
- Are connection, capacity, line, frontage, or inspection charges due?
- Who is responsible for the lateral, road opening, easements, excavation, and restoration?
- Is public water available independently of sewer service?
Proximity does not establish a right to connect. In Logan, for example, a Keller Road property outside the city was considered technically serviceable in 2025. However, annexation would have been required before the connection could proceed.
What a septic soil evaluation actually examines
A septic review involves more than a basic “perc test.” Ohio’s soil-evaluation rules require documentation of soil horizons, texture, structure, color, and signs of saturated soil. The evaluation also covers slope, contours, drainage, bedrock, fill, mine spoil, and other conditions that could limit treatment.
The accompanying site information must account for the house, driveway, hardscape, wells, geothermal systems, easements, rights-of-way, surface water, and disturbed ground. In addition, slopes, wetlands, drainage tiles, rock outcrops, and similar constraints can reduce the usable area. These limitations can affect even a large parcel.
This is why acreage alone does not determine whether land is buildable. A better approach is to complete a lot evaluation before fixing the house location. Then use the findings to coordinate the driveway, foundation, well, and wastewater plan.
The replacement area must remain usable
Ohio requires enough suitable land for the primary system and a replacement area. The design must identify that reserve area and protect it from construction, additional development, and damage. Boards of health cannot waive sufficient replacement area when reviewing newly created lots and subdivisions.
Do not put the future garage, pool, driveway, utility trench, or home addition in that area. Also keep heavy equipment and material storage out of the reserve area. Soil disturbance and compaction can affect its future use.
Fairfield County requires a private soil evaluator
Fairfield County Health Department requires a soil report for every new-system application, regardless of acreage or when the lot was created. The owner must hire a certified soil scientist or evaluator. Fairfield County Health Department does not perform that soil test.
The local sequence has five steps. Follow them in this order:
- Engage a certified soil professional and obtain the soil report.
- Submit the report with the Site & Design Review Application.
- Receive the health department’s Calculation Worksheet identifying potential system types and sizes.
- Give that worksheet to a registered installer, designer or engineer for system design.
- Submit the design and obtain the required installation permit before work starts.
For proposed lot creation, Fairfield County requires an Order One Soil Evaluation for each proposed lot. In addition, the suitable area must be contiguous rather than divided by waterways, easements, rights-of-way or other constraints.
Fairfield County Health Department’s Environmental Health office is at 1550 Sheridan Drive, Suite 100, Lancaster. It can be reached at 740-652-2800, option 3. General office hours are Monday through Friday, 8:00 a.m. to 4:00 p.m.
Hocking County has a limited local evaluation option
Hocking County requires a site evaluation before a home is placed or construction begins. Lot lines need to be identifiable. The review considers soil conditions, slope, surface features, isolation requirements, and expected wastewater flow. It then determines the possible system type and size.
The process differs from Fairfield County in one important respect. Under Hocking County’s January 2025 application materials, some applicants may elect a health-department soil evaluation. The applicant must have lived in Hocking County during the preceding five years and must be building a primary residence. However, the option remains subject to site limitations. It also requires two five-foot test holes dug by a backhoe while the sanitarian is present.
A soil scientist is required for a second residence or income-producing residence. Hocking County’s 2026 fee schedule continues to identify the department evaluation as an option only for an eligible county resident’s primary residence.
For lot splits and subdivisions, a soil scientist must identify feasible system types and enough room for the primary and replacement areas. Hocking County’s 2021 building guidance also states that a new lot without sewer needs 80,000 square feet, or 1.836 acres, of usable land outside the flood zone. In addition, the lot needs at least 100 feet of public-road frontage. That is a lot-creation standard, not proof that an existing parcel of that size will pass its soil evaluation; confirm current requirements with Hocking County Health Department.
The department’s Environmental Health office is at 350 State Route 664 North in Logan. The phone number is 740-385-3030, extension 2. Office hours are Monday through Friday, 8:00 a.m. to 4:00 p.m.
Perry County starts with a soil scientist
Perry County’s process begins with a state-approved soil scientist when public or central sewer is unavailable. The owner then submits the soil report, recorded plat, and county-assigned address. Next, the owner applies for the health department’s site evaluation. Perry County Health Department uses that report to determine the allowable system type.
According to the installation packet revised December 22, 2023, an approved site evaluation remains valid for five years. However, the site conditions, system design, and sewage source must not change. The installation permit is valid for one year. Confirm these periods and all current requirements before relying on an older evaluation or permit.
Perry County’s 2026 lot-split application requires a soil evaluation before health-department review for a proposed lot under five acres. The department will not approve such a lot without the required soil report.
Perry County Health Department is at 2235 OH-13 in New Lexington. It can be reached at 740-342-5179 or healthdepartment@perrycountyohio.gov. Office hours are Monday through Friday from 7:30 a.m. to 4:00 p.m.
For utility questions, Perry County divides water and wastewater administration between northern and southern offices. The Northern Perry County office is at 130 South Main Street in New Lexington, 740-342-1065. Meanwhile, the Southern Perry County office is at 2075 State Route 13 in Crooksville, 740-347-9030 or 740-469-1268. Those broad service areas do not prove that a main reaches a particular parcel.
Permit and connection fees are not installed costs
Comparing septic vs sewer systems requires more than published local fees. A septic budget may also require a private soil evaluator, design, equipment, excavation, electrical work, installation, grading, and restoration. Similarly, a sewer budget may require a private lateral, road work, pumps, easements, plumbing changes, and restoration.
| Jurisdiction and published date | Published government or utility charges | What the figure does not establish |
|---|---|---|
| Fairfield County Health Department Schedule effective October 1, 2025 |
$250 site review, $600 new or replacement HSTS permit including the $74 state fee, and $65 O&M fee. Total: $915. | Not the installed septic-system cost. It excludes the private soil evaluation, design, equipment, installer, excavation, electrical work, grading and restoration. |
| Hocking County Health Department Schedule effective January 1, 2026 |
$135 site evaluation, $662 new or replacement HSTS permit under 500 gallons per day including the $74 state fee, and $55 operation permit. Total: $852. A $50 plan-review fee and separate soil-evaluation charge may also apply. | Not the installed septic-system cost. It excludes private professional work where required, equipment, installation and site restoration. |
| Fairfield County Utilities 2026 connection schedule |
$5,984 for a three-quarter-inch water connection and $7,114 for a three-quarter-inch wastewater connection. Combined: $13,098. | Not the installed water-and-sewer cost. Service lines, laterals, excavation, pumps, road work, plumbing and restoration are excluded. |
| Lancaster Capacity charges changed January 1, 2023 |
For a five-eighths- or three-quarter-inch meter, the sewer capacity charge is $5,789 inside the corporation and $8,684 outside it. The single-family sewer-tap inspection fee is $25. | These are city charges, not the installed cost of the lateral or other site work. |
Some Fairfield County utility areas also have 2026 system line charges. Published examples include $3,500 along specified portions of Pickerington, Milnor, Stemen, Busey, Lockville, Basil Western and Carroll Northern roads. Meanwhile, named subdivisions have listed charges from $1,500 to $5,000. Requirements and charges vary by parcel and utility area, so confirm current figures directly with Fairfield County Utilities.
The comparison shows why permit fees alone cannot answer whether septic or sewer is less expensive. Instead, real pricing requires the soil results or utility connection point. It also requires a preliminary house and site plan and contractor quotes for the full scope.
Settle these questions before buying
- Confirm the utility answer in writing. Ask whether service is available now, whether connection is required and what work falls to the owner.
- Order the correct soil evaluation. Fairfield and Perry require private soil professionals. Hocking’s department option is limited to qualifying primary-residence applicants.
- Map both septic areas. Show the primary system and protected replacement area before placing the house, driveway or outbuildings.
- Confirm water separately. A parcel can have septic with public water or public sewer without confirmed public-water service.
- Price the complete installation. Separate government charges from private design, labor, materials, excavation and restoration.
- Keep feasibility in the purchase decision. Review how to determine whether land is buildable before committing to final plans.
Wastewater also needs to be coordinated with access, drainage and utility routes. Our guide to how utilities affect custom home planning explains why these decisions should be made together rather than one at a time.
Coordinate the wastewater plan with the house
Hearthstone Home & Design provides site evaluation and lot inspection and helps coordinate permit and financing questions. Soil professionals, septic designers, health departments and utility authorities perform their respective evaluations, designs, reviews and approvals. Hearthstone then uses that information to keep the custom home and site plan aligned.
If you are comparing septic vs sewer systems on land in Fairfield, Hocking or Perry County, schedule a free consultation. Call 740-777-4490, email courtney@hearthstonebuild.com, or book an appointment online.